Hall Royd Junction Signal Box Nameboard
NEW! Upper Quadrant Corrugated 4mm signal transfers including LNE shunt, disc and spectacle plates!
<<< Smithy Bridge                                                   Index                                                    Salford >>>
Cab shot showing the up loop at Vitriol Works with the signal still showing a red aspect but the actual points removed, courtesy of 225 Studios
On Monday 6 April 2015 the Manchester North signalling centre was switched out, and the signalling transferred to the new Manchester Signalling Centre at Ashburys. Currently the new centre isn't available in the regional TD feed, and the displays below show how the signallers left the system when they switched out. 
<<< Smithy Bridge                                                 Index                                               Salford >>>

This page contains information made available by Network Rail Infrastructure Limited under license as detailed here.

Banner ad for timetric Rail Infrastructure Construction in the UK to 2018: Market Databook